Skip to content
ServicesWorkAreasStandardsFacts Request a quote Call 0414 441 192
Home/Services/Office partitions
Service

Office partitions

Framed, frameless and demountable glass partition systems.

Office partition glazing turns floor area into rooms without losing light. Anderson Glass installs framed aluminium, frameless and demountable glass partition systems for Melbourne offices and warehouses — measured to the tenancy, with doors, manifestation and acoustic detailing resolved before fabrication.

What it involves

A partition is a small building inside a building. Head channels have to land on something solid, floors are never as level as the drawings say, and the acoustic result depends on the detail at the frame, not the glass alone.

Typical scope

  • Framed aluminium partition systems
  • Frameless butt-jointed glass walls
  • Demountable and relocatable partitions
  • Glass and timber doors, patch fittings, closers
  • Manifestation and privacy film to AS 1428 sight lines
  • Acoustic and double-glazed options
Office partitions
Options

What the glass can be.

OptionWhen it is used
10mm framelessMaximum light, minimum visual weight — patch fittings or channel fixed.
Aluminium framedMore economical over long runs, takes integrated doors and blinds.
Double glazedWhere acoustic separation matters — meeting rooms, consulting rooms, workshops.
DemountableBuilt to come down when the lease ends, without destroying the glass.
Selection

Typical make-ups
for this work.

ApplicationMake-upThicknessSelected under
Frameless partitionToughened monolithic10mm / 12mmAS 1288, AS 2208
Framed partitionToughened or laminated6mm – 10mmAS 1288, AS 2208
Acoustic partitionDouble glazed unit6-12-6 or 6-16-6AS 1288, AS 4666
Partition doorToughened, patch fitted10mm / 12mmAS 1288
ManifestationApplied film—AS 1428.1 sight lines

Indicative only. Each job is selected on the measured panel size, the height above floor, what is above and below, and the wind or impact loads that apply. How AS 1288 is applied →

Questions

Asked about
office partitions.

Can partitions be added while we keep working?
Usually yes. Partition glazing is staged in sections, and the noisiest work — cutting, drilling, silicone — is scheduled before hours or in a defined window.
Do I need consent or a permit?
That depends on the building and whether the work touches base build services, fire systems or egress. We will tell you when a partition run is likely to need building approval before we quote it.
Can I reuse partitions when I move?
If they were built demountable. A frameless system is generally fixed to the tenancy — worth deciding at the start.
Also

Other services.

Next step

Send a photo.
Get a real answer.

A photo of the opening, the suburb and a rough size is enough for us to tell you what is possible.